The Canal oriented projects of KMRL

Consultancy Service Agreement for the Canal Oriented Projects Being Executed by Kochi Metro Rail Limited

In 2018 SWI conducted a feasibility study to install rainwater harvesting at metro stations and viaducts to ensure water sustainability of KMRL. This [project was successfully completed and the RWH systems are now installed at various metro stations, so KMRL assigned SWI as a knowledge partner to develop additional, sustainable water initiatives. As a part of this SWI adjudged the adequacy of flood plain studies and Water Channel Modelling studies (including analysis using relevant software) to be done as part of the Canal projects to achieve the project objectives of the “Canal Oriented Projects” executed by KMRL.

Join the race to make the world a better place